GST on Cement 2026: 18% Rate, Price per Bag and ITC Rules
Government data: GST portal HSN directory and CBIC rate notifications. Rates as per 01/2026-Central Tax (Rate), 30 Apr 2026 (in force from 1 May 2026). Last checked 20 Nov 2026.
40 results for “Works contract”
- 9954SAC1% or 5% or 18%
Construction services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995428SAC1% or 5% or 18%
Construction services
General construction services of other civil engineering works nowhere else classified
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995424SAC1% or 5% or 18%
Construction services
General construction services of local water and sewage pipelines, electricity and communication cables and related works
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995479SAC1% or 5% or 18%
Construction services
Services involving repair, alterations, additions, replacements, maintenance of the completion/finishing works covered above
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995423SAC1% or 5% or 18%
Construction services
General construction services of long-distance underground/ overland/ submarine pipelines, communication and electric power lines (cables); pumping stations and related works; transformer stations and related works
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995456SAC1% or 5% or 18%
Construction services
Masonry services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995471SAC1% or 5% or 18%
Construction services
Glazing services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995454SAC1% or 5% or 18%
Construction services
Concrete services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995473SAC1% or 5% or 18%
Construction services
Painting services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995431SAC1% or 5% or 18%
Construction services
Demolition services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995465SAC1% or 5% or 18%
Construction services
Insulation services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995472SAC1% or 5% or 18%
Construction services
Plastering services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995457SAC1% or 5% or 18%
Construction services
Scaffolding services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995477SAC1% or 5% or 18%
Construction services
Fencing and railing services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995474SAC1% or 5% or 18%
Construction services
Floor and wall tiling services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995476SAC1% or 5% or 18%
Construction services
Joinery and carpentry services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995464SAC1% or 5% or 18%
Construction services
Gas fitting installation services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995453SAC1% or 5% or 18%
Construction services
Roofing and waterproofing services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995455SAC1% or 5% or 18%
Construction services
Structural steel erection services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995433SAC1% or 5% or 18%
Construction services
Excavating and earthmoving services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995451SAC1% or 5% or 18%
Construction services
Pile driving and foundation services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995462SAC1% or 5% or 18%
Construction services
Water plumbing and drain laying services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995466SAC1% or 5% or 18%
Construction services
Lift and escalator installation services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995452SAC1% or 5% or 18%
Construction services
Building framing and roof framing services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995468SAC1% or 5% or 18%
Construction services
Other installation services nowhere else classified
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995435SAC1% or 5% or 18%
Construction services
Other site preparation services nowhere else classified
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995425SAC1% or 5% or 18%
Construction services
General construction services of mines and industrial plants
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995444SAC1% or 5% or 18%
Construction services
Other assembly and erection services nowhere else classified
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995475SAC1% or 5% or 18%
Construction services
Other floor laying, wall covering and wall papering services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995416SAC1% or 5% or 18%
Construction services
Construction services of other buildings nowhere else classified
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995458SAC1% or 5% or 18%
Construction services
Other special trade construction services nowhere else classified
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995434SAC1% or 5% or 18%
Construction services
Water well drilling services and septic system installation services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995441SAC1% or 5% or 18%
Construction services
Installation, assembly and erection services of prefabricated buildings
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995427SAC1% or 5% or 18%
Construction services
General construction services of outdoor sport and recreation facilities
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995478SAC1% or 5% or 18%
Construction services
Other building completion and finishing services nowhere else classified
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995463SAC1% or 5% or 18%
Construction services
Heating, ventilation and air conditioning equipment installation services
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: GST on AC 2026: 18% Rate (Cut From 28%), HSN 8415, Repair and ITC → - 995426SAC1% or 5% or 18%
Construction services
General construction services of power plants and its related infrastructure
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995442SAC1% or 5% or 18%
Construction services
Installation, assembly and erection services of other prefabricated structures and constructions
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995411SAC1% or 5% or 18%
Construction services
Construction services of single dwelling or multi dwelling or multi-storied residential buildings
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 → - 995421SAC1% or 5% or 18%
Construction services
General construction services of highways, streets, roads, railways and airfield runways, bridges and tunnels
- 18% Works contract and other construction services (standard rate)
- 5% Construction of residential apartments in a real estate project (other than affordable), without input tax credit
- 1% Construction of affordable residential apartments in a real estate project, without input tax credit
Special cases
- 18% All other services not specified elsewhere (standard rate)
Notification 11/2017 as amended (15/2025)
Read more: SAC Code for Construction Services: 9954, Works Contract GST 2026 →
HSN codes and GST rates for cement
From the GST portal HSN list, with the rate from the current CBIC notification. Tap Copy to use the code on your invoice.
- 2523HSN18%
Portland cement, aluminous cement, slag cement, supersulphate cement and similar hydraulic cements, whether or not coloured or in the form of clinkers
Notification 9/2025-CT(Rate), Schedule II, S. No. 9
Read more: HSN Code for Cement →
Quick answer
GST on cement is 18% under HSN 2523 from 22 September 2025, down from 28%, under Notification 9/2025-Central Tax (Rate). A sale within a state carries 9% CGST and 9% SGST; a sale to another state carries 18% IGST. On a 50 kg bag priced ₹340 before tax, GST is ₹61.20, which is ₹34 less than before.
GST on cement is 18% from 22 September 2025. Until 21 September 2025 it was 28%, one of the highest slabs in the tax. The cut came from the 56th GST Council meeting held on 3 September 2025 and was notified by Notification 9/2025-Central Tax (Rate), dated 17 September 2025, which lists cement in Schedule II (9% CGST, so 18% in total).
This page is about what that rate means in money: the tax on each 50 kg bag, how much less a family pays to build a house, when builders and contractors can claim the GST back as input tax credit, which works contract rate applies, and what dealers and transporters must do on the invoice and the e-way bill. For the eight-digit codes of each cement type, see our page on the HSN code for cement.
GST on cement in 2026: the key facts
| Point | Position from 22 September 2025 |
|---|---|
| GST rate | 18% on every type of cement (OPC, PPC, slag, white, clinker) |
| HSN heading | 2523 |
| Sale within the same state | 9% CGST + 9% SGST (or UTGST) |
| Sale to another state | 18% IGST |
| Legal basis | Notification 9/2025-Central Tax (Rate), Schedule II, S. No. 9 |
| Compensation cess | None |
| Who pays the tax to the government | The registered seller, under forward charge |
| Earlier rate | 28% from 1 July 2017 to 21 September 2025 |
The rate does not depend on the brand, grade or bag size. A bag of UltraTech, ACC, Ambuja, Shree, JK or any other brand carries the same 18%. The buyer pays the GST as part of the price; the seller collects it and deposits it with its GST return.
Cement GST rate history and what changed on 22 September 2025
| Period | GST on cement | Source |
|---|---|---|
| 1 July 2017 to 21 September 2025 | 28% (14% CGST + 14% SGST, or 28% IGST) | Notification 1/2017-Central Tax (Rate), Schedule IV, S. No. 18 |
| 3 September 2025 | 56th GST Council recommends 28% to 18% | GST Council press release |
| From 22 September 2025 | 18% (9% CGST + 9% SGST, or 18% IGST) | Notification 9/2025-Central Tax (Rate), Schedule II, S. No. 9, dated 17 September 2025 |
Notification 9/2025 replaced the old goods rate notification as a whole. The matching service changes came through Notification 15/2025-Central Tax (Rate), which amended the services rate notification (11/2017). Both took effect on 22 September 2025. Each state issued a matching State Tax (Rate) notification, and matching Integrated Tax (Rate) notifications cover IGST.
Which rate applies to sales around the change date
The rate depends on the time of supply under Section 14 of the CGST Act, not on the date of the order. In short, if two of the three events (supply of the cement, invoice, payment) happened before 22 September 2025, the old 28% applies; if two happened on or after that date, 18% applies. The government's FAQs on the 56th Council decisions add three practical points:
- Stock that a dealer already held on 22 September 2025 is billed at 18% when sold from that date, whatever rate was paid on its purchase.
- GST credit already in the electronic credit ledger, including credit taken at 28%, can be used to pay output tax at the new rate.
- E-way bills generated before the change for goods in transit stayed valid for their original validity period.
How to calculate GST on cement
Two formulas cover every bill:
- Adding GST: GST = price before tax × 18 ÷ 100. Price with GST = price before tax × 1.18.
- Removing GST from a tax-inclusive price: price before tax = inclusive price ÷ 1.18. GST = inclusive price × 18 ÷ 118.
Example: cement bought within the same state
A contractor in Lucknow buys 150 bags of PPC at ₹345 a bag (before tax) from a dealer in the same city.
| Line | Amount |
|---|---|
| Taxable value (150 × ₹345) | ₹51,750.00 |
| CGST at 9% | ₹4,657.50 |
| SGST at 9% | ₹4,657.50 |
| Invoice total | ₹61,065.00 |
Example: the same cement bought from another state
If the dealer were in Madhya Pradesh and the site in Uttar Pradesh, the bill would show IGST at 18%, which is ₹9,315.00 on ₹51,750. The invoice total is the same ₹61,065. Only the split changes: one tax (IGST) instead of two (CGST and SGST). The place of supply for goods moved by road is where the movement ends, so the site's state decides.
Example: finding the GST inside a shop price
A retailer quotes ₹410 a bag, "GST included". The price before tax is ₹410 ÷ 1.18 = ₹347.46, and the GST inside it is ₹62.54. You can check any bill this way with our GST calculator by choosing "remove GST" and the 18% rate.
GST on a 50 kg cement bag: price examples
The table shows the tax on one bag at four common pre-tax prices, under the old and the new rate. These are worked examples, not market prices, which vary by region, brand and month.
| Bag price before GST | GST at 28% (old) | Price at 28% | GST at 18% (now) | Price at 18% | Tax saved per bag |
|---|---|---|---|---|---|
| ₹300 | ₹84.00 | ₹384.00 | ₹54.00 | ₹354.00 | ₹30 |
| ₹340 | ₹95.20 | ₹435.20 | ₹61.20 | ₹401.20 | ₹34 |
| ₹380 | ₹106.40 | ₹486.40 | ₹68.40 | ₹448.40 | ₹38 |
| ₹420 | ₹117.60 | ₹537.60 | ₹75.60 | ₹495.60 | ₹42 |

The tax saved is always 10% of the pre-tax price, because the rate fell by 10 percentage points. At the same pre-tax price, the price you pay falls by about 7.8% (1.18 ÷ 1.28 = 0.922).
What happened in the market was close to this. Business Standard, quoting brokerage reports, put the fall in the tax-inclusive price at about 7.8%, or roughly ₹25 a bag, and the average trade price at about ₹345 a bag in September 2025. Its report of 21 September 2026 also said that companies tried price increases of ₹10 to ₹15 a bag in several regions in March and April, and put the average price at about ₹360 a bag as of August. So the rate cut lowered the tax, but the base price still moves with demand, fuel and freight costs.
How much the GST cut on cement saves on a house
Builders and engineers often estimate cement at about 0.4 bags per square foot of built-up area for a standard RCC house. That is a site rule of thumb, not an official norm; your structural design and bill of quantities will give the real figure. Using it with a pre-tax price of ₹340 a bag:
| Built-up area | Approx. bags | GST at 28% | GST at 18% | Saving |
|---|---|---|---|---|
| 1,000 sq ft | 400 | ₹38,080 | ₹24,480 | ₹13,600 |
| 1,500 sq ft | 600 | ₹57,120 | ₹36,720 | ₹20,400 |
| 2,000 sq ft | 800 | ₹76,160 | ₹48,960 | ₹27,200 |
| 3,000 sq ft | 1,200 | ₹1,14,240 | ₹73,440 | ₹40,800 |
On a 1,000 sq ft house costing ₹20 lakh, ₹13,600 is about 0.7% of the total. Useful, but small, because cement is only one part of the cost. Steel bars stay at 18%, sand and aggregates stay at 5%, and labour is the other large item. A few materials did fall on 22 September 2025: sand lime bricks and marble and granite blocks moved from 12% to 5%.
Who actually gets the saving
- You buy the cement yourself and pay a mason for labour: you get the full saving, since GST is a cost you cannot recover. A pure labour contract for building a single house (not part of a residential complex) is exempt from GST under Notification 12/2017-Central Tax (Rate), so the labour bill carries no GST.
- You give the whole job to a contractor (material plus labour): this is a works contract taxed at 18% on the full contract value. The contractor could already claim back the GST on cement as credit, both before and after the cut, so the cut does not lower your GST directly. Any saving reaches you only through a lower quote.
- You buy a flat from a builder: the 1% and 5% rates on flats did not change. Builders on those rates cannot claim credit, so their cement cost did fall; whether they lower prices is a commercial choice.
ITC on cement for builders and contractors under Section 17(5)(c) and (d)
Input tax credit decides the real cost of cement for a business far more than the rate itself. Two clauses of Section 17(5) of the CGST Act block it:
- Clause (c) blocks credit on works contract services received for constructing immovable property (other than plant and machinery), except where the works contract is an input service for a further supply of works contract service.
- Clause (d) blocks credit on goods or services received for constructing immovable property (other than plant and machinery) on your own account, even when the building is used for business.
"Construction" includes renovation, additions, alterations and repairs to the extent they are capitalised. "Plant and machinery" covers apparatus, equipment and machinery fixed to the earth by a foundation or structural support and used to make outward supplies, including that foundation, but not land, buildings or other civil structures, telecom towers, or pipelines laid outside the factory. The Finance Act, 2025 changed the words "plant or machinery" in clause (d) to "plant and machinery" with effect from 1 July 2017. That largely undoes the opening the Supreme Court gave in Safari Retreats (October 2024) for buildings let out on rent.
| Situation | Credit on GST paid for cement | Why |
|---|---|---|
| Main contractor building for a client and charging 18% | Allowed | Cement is an input for a taxable outward works contract, not own-account construction |
| Sub-contractor billing the main contractor | Allowed, and the main contractor gets credit on the sub-contractor's bill | Clause (c) exception for works contracts supplied onward |
| Developer selling flats at 1% or 5% | Not allowed | Those rates are notified without credit |
| Developer selling commercial units in a non-residential project at 18% | Allowed | That rate comes with credit |
| Units sold only after the completion certificate | Not allowed for those units | Sale of a completed building is neither a supply of goods nor of services, so the cement goes into a non-taxable activity |
| Company building its own office, factory shed, warehouse, hotel or mall | Not allowed | Clause (d), own-account construction |
| Foundation or support for a machine | Allowed | Part of "plant and machinery" |
| Repairs charged to the profit and loss account | Allowed | Not capitalised, so not "construction" |
What the cut means for a contractor's cash
Take a contractor building a ₹20 lakh commercial structure who buys ₹4 lakh of cement before tax. At 18%, the cement GST is ₹72,000; at 28% it was ₹1,12,000. Both amounts were recoverable as credit, so the profit is the same. The gain is cash flow: ₹40,000 less is locked up between buying the cement and using the credit against the 18% charged on the contract.
For a developer on the 5% residential rate, the effect is direct. A project that buys ₹50 lakh of cement before tax now pays ₹9 lakh of GST instead of ₹14 lakh, and since no credit is allowed, ₹5 lakh comes straight off the construction cost.
The 80% rule and cement from unregistered suppliers
A developer paying the 1% or 5% rate must buy at least 80% of its inputs and input services (by value) from registered suppliers, as a condition in Notification 11/2017-Central Tax (Rate) as amended by Notification 3/2019. Any shortfall is taxed in the developer's hands under reverse charge, paid in cash. Cement that forms part of the shortfall has its own entry, S. No. 2 of Notification 7/2019-Central Tax (Rate), and is taxed at the cement rate, which is 18% from 22 September 2025. On ₹2 lakh of such cement, that is ₹36,000 instead of the earlier ₹56,000.
Works contract GST rates where cement is part of the job
When cement is supplied as part of a contract to build, repair or renovate a structure, it stops being a separate sale of goods. The whole contract is a works contract service under heading 9954, and the contract rate applies to the full value, not 18% on the cement and something else on labour.
| Type of contract | GST rate | Credit |
|---|---|---|
| Works contracts for private, commercial and industrial buildings (residual entry, S. No. 3(xii)) | 18% | Yes |
| Government works contracts involving mainly earthwork (over 75% of value), and sub-contracts for them | 18% from 22 September 2025 (was 12%) | Yes |
| Offshore oil and gas works contracts | 18% from 22 September 2025 (was 12%) | Yes |
| Affordable residential apartments sold by a promoter before completion | 1% (effective, after the one-third land deduction) | No |
| Other residential apartments sold before completion | 5% (effective) | No |
| Pure labour contract for a single residential unit | Exempt | Not relevant |
The three 12% items (earthwork contracts for government, their sub-contracts, and offshore oil and gas contracts) were raised to 18% by Notification 15/2025-Central Tax (Rate), which changed items (vii), (viii) and (x) of S. No. 3. Government contracts have other specific entries and exemptions, so check the exact entry for the project before quoting. For service codes and the full list, see our guide to SAC codes for construction services.
RMC, concrete blocks and cement bricks
Once cement is mixed or moulded into a product, the product's own rate applies:
- Ready-mix concrete (RMC): 18%. Supplied by transit mixer and billed per cubic metre, it is a sale of goods. If the supplier also lays and finishes the concrete under a contract, the job can become a works contract.
- Concrete blocks, cement bricks, paver blocks and precast items: 18%, as articles of cement or concrete (heading 6810).
- Clay bricks and fly ash bricks: 12% under Notification 14/2025-Central Tax (Rate), one of the few goods kept at 12%.
- Sand lime bricks: 5% from 22 September 2025.
The codes for each of these are on our HSN code for cement page.
GST rules for cement dealers and retailers
Registration
A dealer in goods must register once aggregate turnover crosses ₹40 lakh in a financial year in most states (a lower limit of ₹20 lakh or ₹10 lakh applies in a few states). A dealer who sells to another state must register from the first such sale, whatever the turnover. In practice most cement dealers register early, because contractors and builders want a tax invoice to claim credit. Our GST registration service handles the application.
Composition scheme
A small shop with turnover up to ₹1.5 crore (₹75 lakh in some north-eastern and hill states) can opt for composition and pay 1% of turnover (0.5% CGST + 0.5% SGST). It cannot collect GST from customers, cannot issue a tax invoice, cannot claim credit and cannot sell to other states. The 18% paid on purchases then becomes part of the shop's cost.
Old stock bought at 28%
Many dealers had stock on 21 September 2025 that carried 28% credit and had to be sold at 18% from the next day. The credit stays usable against any output tax. It cannot be refunded as an "inverted duty" refund, because the government's FAQs say that refund applies only where the input and output are different goods with different rates, not the same goods taxed differently over time. The excess credit is used up against later sales.
Invoices, credit notes and excess tax
- Show the HSN code (at least 2523 on B2B invoices if last year's turnover was up to ₹5 crore, six digits above that), the rate, and the CGST/SGST or IGST split.
- A business whose aggregate turnover crossed ₹5 crore in any year from 2017-18 must issue e-invoices for B2B sales.
- Any GST collected at 28% on a supply made after 21 September 2025 must still be deposited under Section 76 unless it is passed back to the buyer through a credit note. Issue the credit note in time: the last date is 30 November after the end of the financial year, or the date of filing the annual return if earlier (Section 34).
Our tax consultants help dealers and contractors with returns, credit reconciliation and multi-state registrations. You can also check a supplier's GSTIN with our GSTIN validator before claiming credit.
E-way bill rules for cement loads
Cement moves by truck, so the e-way bill is part of almost every sale. The main rules under Rule 138 of the CGST Rules:
- Value limit: an e-way bill is needed when the consignment value exceeds ₹50,000. The value includes GST. Some states set a different limit for movement within the state, so check your state's rule for local deliveries.
- How many bags that is: at ₹401.20 a bag including GST (₹340 + 18%), 124 bags come to ₹49,748.80 and need no e-way bill; 125 bags come to ₹50,150 and do.
- Who generates it: the seller, buyer or transporter. Part A holds invoice details, including the HSN; Part B holds the vehicle number.
- Validity: one day for up to 200 km, plus one day for each further 200 km or part of it. A 450 km trip gets three days.
- Old documents: since 1 January 2025 the portal does not accept an invoice dated more than 180 days before the e-way bill, and a bill can be extended only up to 360 days from its original generation.
- No valid e-way bill: the goods and vehicle can be detained under Section 129, and released on a penalty of 200% of the tax payable if the owner comes forward.
Example: one truck of cement
A 20-tonne truck carries 400 bags. At ₹340 a bag before tax, the value is ₹1,36,000, GST is ₹24,480 and the consignment value is ₹1,60,480. The e-way bill must show the same taxable value, tax amounts and HSN as the invoice.
Cement GST mistakes that cost money
- Taking credit at 28% on bills dated after 21 September 2025. A supplier who still charged 28% after the change collected excess tax. The buyer should ask for a credit note, not keep the excess as credit.
- Splitting a works contract bill. Billing cement at 18% and labour separately does not change the nature of a works contract. The whole contract is one service at the contract rate.
- Leaving GST out of the e-way bill value. The ₹50,000 limit is checked on the value including tax. A load of ₹45,000 before tax is ₹53,100 after tax and needs an e-way bill.
- Developers on 1% or 5% rates claiming cement credit. Those rates are without credit; credit claimed must be reversed with interest.
- Charging CGST and SGST on a delivery to another state. If the truck crosses a state border, the tax is IGST. Paying the wrong tax means paying again and claiming a refund of the first payment.
Check GST on other building materials
For any material not covered here, search our GST rate finder or the HSN code finder, and work out the tax on a bill with the GST calculator.
Related GST rates: once the building is up, commercial rent on it carries 18% and a home let to live in is exempt. An AC is also 18%, home, fire and other general insurance is 18%, and a car is 18% or 40% (5% if electric).
Official sources: PIB: recommendations of the 56th GST Council meeting · PIB: FAQs on the 56th GST Council decisions · GST Council: CGST rate notifications · CBIC tax information portal · E-way bill portal.
Frequently asked questions
What is the GST on cement in 2026?
GST on cement is 18% in 2026. It applies to OPC, PPC, slag cement, white cement and clinker under HSN 2523, through Notification 9/2025-Central Tax (Rate), Schedule II, S. No. 9. A sale within a state is billed as 9% CGST plus 9% SGST, and a sale to another state as 18% IGST.
When did GST on cement change from 28% to 18%?
The change took effect on 22 September 2025. The GST Council recommended it at its 56th meeting on 3 September 2025, and the government notified it on 17 September 2025. From 1 July 2017 until 21 September 2025, cement was taxed at 28%. Invoices for supplies made after that date must show 18%.
How much GST is charged on one bag of cement?
GST on a bag is 18% of its price before tax. A 50 kg bag priced at ₹340 before tax carries ₹61.20 of GST, so the buyer pays ₹401.20. At ₹380 before tax, GST is ₹68.40 and the bag costs ₹448.40. The old 28% rate added ₹10 more tax per ₹100 of value.
What is the GST rate for UltraTech cement?
UltraTech cement attracts 18% GST, the same as every other brand. GST depends on the product's classification, not the company that makes it. So ACC, Ambuja, Shree, JK, Dalmia, Ramco and UltraTech bags all carry 18%, whether the cement is OPC, PPC or slag, and whatever its grade or bag size.
Is 12% GST still applicable on building materials?
Mostly not. The 12% slab was removed for nearly all goods from 22 September 2025, with items moving to 5% or 18%. A few goods were kept at 12% by a separate notification, 14/2025-Central Tax (Rate), including clay building bricks, fly ash bricks and blocks, and earthen roofing tiles. Cement itself was never at 12%.
Which construction materials are taxed at 5% GST?
Natural sand, gravel and crushed stone aggregates, lime, gypsum and raw fly ash are taxed at 5%. From 22 September 2025, sand lime bricks and marble and granite blocks also moved from 12% to 5%. Cement, steel bars, tiles, paints, pipes and ready-mix concrete are at 18%, so check each item before quoting.
What is the GST rate on cement bricks in 2026?
Cement bricks, concrete blocks and paver blocks are taxed at 18% in 2026, because they are articles of cement or concrete under heading 6810. This is different from clay bricks and fly ash bricks, which stay at 12%, and sand lime bricks, which are at 5%. Use the right heading on the invoice.
How do I calculate GST on cement from the bill amount?
If the bill shows a price including GST, divide it by 1.18 to get the price before tax. The difference is the GST. For example, ₹410 divided by 1.18 is ₹347.46, so the GST inside is ₹62.54. Half of it is CGST and half SGST for a sale within the same state.
Can a contractor claim ITC on cement used in a works contract?
Yes. A contractor who builds for a client and charges GST on the works contract can claim credit on cement, because the cement is used for a taxable outward supply. Section 17(5)(d) blocks credit only for construction on the taxpayer's own account. The contractor needs a proper tax invoice and the supplier's filed return.
Can a builder of residential flats claim GST credit on cement?
Not when the flats are sold at the 1% affordable or 5% residential rates, because those rates are notified without input tax credit. The GST on cement becomes part of construction cost. That is why the cut to 18% directly lowered builders' costs. Commercial units sold at 18% in non-residential projects do allow credit.
Can I claim GST back on cement for building my own house?
No. An individual building a home is not supplying anything taxable, so there is no output tax to set the credit against. The GST on cement is simply part of the cost. The cut from 28% to 18% saves about ₹34 per bag at a ₹340 pre-tax price, or roughly ₹13,600 on 400 bags.
Is an e-way bill required for transporting cement bags?
An e-way bill is required when the value of a consignment, including GST, exceeds ₹50,000. At ₹401.20 a bag including tax, that point is crossed at 125 bags. The bill is valid for one day per 200 km. Some states use a different limit for movement within the state, so check local rules.
What is the GST on cement and steel?
Both are taxed at 18%. Cement came down from 28% to 18% on 22 September 2025. Steel bars and rods, including TMT bars under headings 7213 to 7215, were already at 18% and did not change. Within a state each is billed as 9% CGST plus 9% SGST, and a works contractor can usually claim credit on both.
What happens to a dealer's ITC on cement bought at 28%?
The dealer keeps the credit and can use it to pay output tax on later sales at 18%. The government's FAQs on the rate change say it cannot be refunded as an inverted duty refund, because the input and output are the same goods. So the excess credit is used up over the following months.
What GST applies to ready-mix concrete?
Ready-mix concrete is taxed at 18%, the same as cement. When RMC is delivered by transit mixer and billed by the cubic metre, it is a sale of goods. If the supplier also lays, compacts and finishes the concrete under a contract, the whole job may be taxed as a works contract service instead.
Sources: GST portal HSN/SAC directory (updated 23 Oct 2026) · CBIC rate notifications: 9/2025-Central Tax (Rate) as amended up to 01/2026-Central Tax (Rate), 30 Apr 2026 (in force from 1 May 2026); services under 11/2017-Central Tax (Rate) as amended. Rates are the total GST (CGST + SGST, or IGST). Content updated .
Reviewed By
Expert for this topic GST classification and rates
Abhinay Rai
Advocate
Abhinay Rai is a Advocate specialising in GST classification and rates. The codes, rates and examples on this page are checked against the GST portal HSN directory and the current CBIC rate notifications, and are updated when a new notification is issued.