ITR due date, transfer pricing cases: 30 Nov 2026 5 days left

TDS / TCS deposit for last month: 7 Dec 2026 12 days left

GSTR-1 (monthly filers): 11 Dec 2026 16 days left

Advance tax, 3rd instalment (75%): 15 Dec 2026 20 days left

+91 87500 70081wecare@taxcaller.comAsk TaxCaller

GST on Solar Panels 2026: 5% Rate, 8.9% on Installation, HSN 8541

Government data: GST portal HSN directory and CBIC rate notifications. Rates as per 01/2026-Central Tax (Rate), 30 Apr 2026 (in force from 1 May 2026). Last checked 20 Nov 2026.

No code found for “PM Surya Ghar”

Try a simpler word (for example "shirt" instead of "cotton formal shirt"), the first 4 digits of the code, or switch between goods and services.

    HSN codes and GST rates for solar panel

    From the GST portal HSN list, with the rate from the current CBIC notification. Tap Copy to use the code on your invoice.

    • 854142HSN18%

      Semiconductor devices (for example, diodes, transistors, semiconductor-based transducers), photosensitive semiconductor, devices, including photovoltaic cells whether or not assembled in modules or made up into panels, l

      Photovoltaic cells not assembled in modules or made up into panels

      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule II, S. No. 513

    • 85414200HSN18%

      Semiconductor devices (for example, diodes, transistors, semiconductor-based transducers), photosensitive semiconductor, devices, including photovoltaic cells whether or not assembled in modules or made up into panels, l

      Photovoltaic cells not assembled in modules or made up into panels

      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule II, S. No. 513

    • 854143HSN18%

      Semiconductor devices (for example, diodes, transistors, semiconductor-based transducers), photosensitive semiconductor, devices, including photovoltaic cells whether or not assembled in modules or made up into panels, l

      Photovoltaic cells assembled in modules or made up into panels

      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule II, S. No. 513

    • 85414300HSN18%

      Semiconductor devices (for example, diodes, transistors, semiconductor-based transducers), photosensitive semiconductor, devices, including photovoltaic cells whether or not assembled in modules or made up into panels, l

      Photovoltaic cells assembled in modules or made up into panels

      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule II, S. No. 513

    • 841912HSN5%

      Machinery, plant or laboratory equipment, whether or not electrically heated ( excluding furnaces , ovens and other equipment of heading 8514 ), for the treatment of materials by a process involving a change of temperatu

      Solar water heaters

      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 5% Disposable sterilized dialyzer or micro barrier of artificial kidney
      • 18% Parts suitable for use solely or principally with fixed Speed Diesel Engines of power not exceeding 15HP

      Notification 9/2025-CT(Rate), Schedule I, S. No. 428

    • 84191200HSN5%

      Machinery, plant or laboratory equipment, whether or not electrically heated ( excluding furnaces , ovens and other equipment of heading 8514 ), for the treatment of materials by a process involving a change of temperatu

      Solar water heaters

      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 5% Disposable sterilized dialyzer or micro barrier of artificial kidney
      • 18% Parts suitable for use solely or principally with fixed Speed Diesel Engines of power not exceeding 15HP

      Notification 9/2025-CT(Rate), Schedule I, S. No. 428

    • 850440HSN5% or 18%

      Electrical transformers, static converters (for example, rectifiers) and inductors

      Static converters:

      • 5% Charger or charging station for Electrically operated vehicles
      • 18% Electrical transformers, static converters (for example, rectifiers) and inductors other than charger or charging station for Electrically operated vehicles
      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule I, S. No. 438

    • 85044010HSN5% or 18%

      Electrical transformers, static converters (for example, rectifiers) and inductors › Static converters

      Electric inverter

      • 5% Charger or charging station for Electrically operated vehicles
      • 18% Electrical transformers, static converters (for example, rectifiers) and inductors other than charger or charging station for Electrically operated vehicles
      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule I, S. No. 438

    • 85044021HSN5% or 18%

      Electrical transformers, static converters (for example, rectifiers) and inductors › Static converters

      Dip bridge rectifier

      • 5% Charger or charging station for Electrically operated vehicles
      • 18% Electrical transformers, static converters (for example, rectifiers) and inductors other than charger or charging station for Electrically operated vehicles
      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule I, S. No. 438

    • 85044029HSN5% or 18%

      Electrical transformers, static converters (for example, rectifiers) and inductors › Static converters

      Other

      • 5% Charger or charging station for Electrically operated vehicles
      • 18% Electrical transformers, static converters (for example, rectifiers) and inductors other than charger or charging station for Electrically operated vehicles
      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule I, S. No. 438

    • 85044030HSN5% or 18%

      Electrical transformers, static converters (for example, rectifiers) and inductors › Static converters

      Battery chargers

      • 5% Charger or charging station for Electrically operated vehicles
      • 18% Electrical transformers, static converters (for example, rectifiers) and inductors other than charger or charging station for Electrically operated vehicles
      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule I, S. No. 438

    • 85044040HSN5% or 18%

      Electrical transformers, static converters (for example, rectifiers) and inductors › Static converters

      Voltage regulator and stabilizers (other than automatic)

      • 5% Charger or charging station for Electrically operated vehicles
      • 18% Electrical transformers, static converters (for example, rectifiers) and inductors other than charger or charging station for Electrically operated vehicles
      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule I, S. No. 438

    • 85044090HSN5% or 18%

      Electrical transformers, static converters (for example, rectifiers) and inductors › Static converters

      Other

      • 5% Charger or charging station for Electrically operated vehicles
      • 18% Electrical transformers, static converters (for example, rectifiers) and inductors other than charger or charging station for Electrically operated vehicles
      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule I, S. No. 438

    • 8507HSN18%

      Electric accumulators, including separators therefor, whether or not rectangular (including square)

      Special cases
      • 5% Following renewable energy devices and parts for their manufacture:- (a) Bio-gas plant; (b) Solar power-based devices; (c) Solar power generator; (d) Wind mills, Wind Operated Electricity Generator (W
      • 18% Parts suitable for use solely or principally with power driven pumps primarily designed for handling water, namely, centrifugal pumps (horizontal and vertical), deep tube-well turbine pumps, submersib
      • 18% E-waste Explanation.- For the purpose of this entry, E-waste means electrical and electronic equipment listed in Schedule I of the E- Waste (Management) Rules, 2016 (published in the Gazette of India

      Notification 9/2025-CT(Rate), Schedule II, S. No. 480

    Quick answer

    GST on solar panels is 5% from 22 September 2025, down from 12%, under HSN 8541 43 00. A single contract to supply and install a solar plant is valued 70% as goods at 5% and 30% as services at 18%, about 8.9% in all. Batteries, mounting structures and inverters bought on their own from a dealer stay at 18%.

    GST on solar panels fell from 12% to 5% on 22 September 2025. Photovoltaic cells and modules, solar power generators, solar power based devices, solar lanterns, solar water heaters and solar cookers all moved to the 5% schedule under Notification 9/2025-Central Tax (Rate). For panels and other listed renewable energy devices, the entry is S. No. 437 of Schedule I, which charges 2.5% CGST and an equal 2.5% SGST, or 5% IGST between states.

    Most homes and factories do not buy panels alone, though. They sign a contract to supply and install a complete rooftop or ground-mounted plant, and for those the law splits the price 70:30 between goods at 5% and services at 18%, which works out to about 8.9% of the contract value. This page explains both rates, the rate on inverters, batteries and structures bought separately, how to check a solar quote, the rate history since 2017, input tax credit for businesses, and how the November 2026 Supreme Court ruling on solar contracts fits in.

    GST on solar panels and solar equipment in 2026

    ItemUsual HSNGST from 22 Sep 2025Before
    Solar PV modules and panels8541 43 005%12%
    Solar cells not made into modules8541 42 005%12%
    Solar power generator / solar power based devices (for example a solar pump set, solar street light)Chapter 84, 85 or 945%12%
    Solar lantern or solar lampAny heading (S. No. 437)5%12%
    Solar water heater and system8419 12 005%12%
    Solar cooker7321 or 85165%12%
    Supply and installation of a complete solar plant (70:30 rule)Goods plus SAC 9954/9983/9987About 8.9% effectiveAbout 13.8%
    Inverter bought on its own8504 4018% (see below)18%
    Battery bought on its own850718%18% (lithium-ion), 28% (lead-acid)
    Mounting structure, cables, switchgear bought on their own7308, 7610, 8544, 853618%18%
    Annual maintenance or cleaning contractSAC 998718%18%
    Electricity generated and sold or exported to the grid2716ExemptExempt

    The 5% entry is wider than panels. It covers "renewable energy devices and parts for their manufacture": bio-gas plants, solar power based devices, solar power generators, wind mills and wind operated electricity generators, waste to energy plants, solar lanterns and lamps, ocean and tidal wave energy devices, and photovoltaic cells whether or not assembled in modules or made up into panels. Wind turbine makers and bio-gas plant suppliers get the same rate. For the full eight-digit codes of any other part, use the HSN code finder.

    GST on solar panel installation: the 70:30 rule

    A turnkey solar contract mixes goods (modules, inverter, structure, cables) with services (design, civil work, erection, commissioning). Without a special rule, sellers and officers would argue over whether the whole job is a 5% supply of goods or an 18% works contract. To end that, the government added an Explanation from 1 January 2019, through Notifications 24/2018-CT(R) and 27/2018-CT(R). It survives in the same form under the new goods notification:

    • When the 5% renewable energy goods are supplied along with other goods and the taxable services covered by S. No. 38 of Notification 11/2017-CT(R), 70% of the gross consideration is deemed the value of the goods, taxed at 5%.
    • The remaining 30% is deemed the value of the services, taxed at 18%.
    • Notification 15/2025-CT(R) rewrote the service-side Explanation so that it now points to S. No. 437 of Schedule I of Notification 9/2025-CT(R), the new 5% entry.

    The blended rate is 0.70 × 5% + 0.30 × 18% = 3.5% plus 5.4% = 8.9%. Under the 12% goods rate it was 0.70 × 12% + 0.30 × 18% = 13.8%. The split is fixed: a contractor cannot show 85% goods and 15% services on the invoice to lower the tax, and a buyer cannot ask for it. The Central Electricity Regulatory Commission, in a suo motu order of 4 November 2025, reproduced S. No. 437 with its 70:30 Explanation and told generators and distribution companies to pass on the 12% to 5% cut under the change-in-law terms of their power purchase agreements.

    The rule applies only when goods and services are supplied together as one contract. If a household buys panels from a dealer at 5% and separately pays an electrician for installation, each bill is taxed at its own rate: 5% on the panels and 18% on the labour.

    How to calculate GST on solar panels and a solar plant

    Work out the tax on the price before GST, then split it into CGST and SGST for a buyer in the same state, or show it as IGST for a buyer in another state. The GST calculator will run these steps for any price.

    Example 1: buying panels only

    LineAmount
    10 modules of 550 W at ₹14,000 each₹1,40,000
    CGST at 2.5%₹3,500
    SGST at 2.5%₹3,500
    Total₹1,47,000

    At the old 12%, the tax on the same modules was ₹16,800, so the buyer now saves ₹9,800.

    Example 2: a 3 kW rooftop system, supply and installation in one contract

    LineValueGST
    Contract price before GST₹1,80,000-
    Goods portion (70%) at 5%₹1,26,000₹6,300 (₹3,150 CGST and ₹3,150 SGST)
    Services portion (30%) at 18%₹54,000₹9,720 (₹4,860 CGST and ₹4,860 SGST)
    Total GST (8.9%)-₹16,020
    Invoice total₹1,96,020-

    Before 22 September 2025 the goods share would have carried ₹15,120 at 12%, making total GST ₹24,840. The household saves ₹8,820 on this contract, which matches the ₹9,000 to ₹10,500 saving the Ministry of New and Renewable Energy estimated for a typical 3 kW system.

    Example 3: a 100 kW plant for a factory in another state

    An EPC firm in Gujarat builds a ₹45,00,000 rooftop plant for a factory in Rajasthan. The goods share is ₹31,50,000, with IGST at 5% of ₹1,57,500. The services share is ₹13,50,000, with IGST at 18% of ₹2,43,000. Total IGST is ₹4,00,500 and the invoice is ₹49,00,500. The factory, if registered and using the power for its taxable business, can claim the ₹4,00,500 as input tax credit.

    Example 4: adding a battery and inverter later

    A homeowner adds a ₹60,000 lithium battery and a ₹45,000 hybrid inverter a year after installation, bought from a dealer. These are separate sales of goods outside the 70:30 contract. Battery GST at 18% is ₹10,800; inverter GST at 18% is ₹8,100.

    GST on solar inverters, batteries and mounting structures

    Inside a single supply-and-install contract, every component sits in the 70% goods share at 5%, whatever its own tariff heading. The question only arises when a component is sold on its own.

    • Inverter: a grid-tie, hybrid or off-grid inverter is a static converter of heading 8504 40, which is at 18%. Some sellers bill an inverter designed only for solar use at 5% as a "solar power based device" or as a part for making a solar power generator. That reading is arguable; the safer course for a stand-alone sale is 18% unless the buyer is a manufacturer using it to make a solar power generator.
    • Battery: lithium-ion and lead-acid storage batteries of heading 8507 are at 18%. For lead-acid units this is a drop from the 28% charged until 21 September 2025.
    • Mounting structure: steel (7308) and aluminium (7610) structures are 18% when sold separately.
    • Cables, connectors, distribution boxes, earthing: 18% when sold separately.
    • Charge controller: sold alone, generally billed at 18%.

    The Uttar Pradesh Authority for Advance Ruling in M/s Apex Powers (order UP_AAR_65, 17 September 2020) held that panels, inverters, controllers and batteries supplied together form a solar power generating system. An advance ruling binds only the applicant and its jurisdictional officer, so others can cite it but cannot rely on it. It supports billing a complete kit at 5%; it does not make each part 5% when sold in a shop.

    GST on solar panels: rate history from 2017

    PeriodRate on solar goodsTurnkey contractInstrument
    1 July 2017 to 31 December 20185%Disputed: 5% or 18%1/2017-CT(R), S. No. 234
    1 January 2019 to 30 September 20215%70:30 rule, about 8.9%24/2018 and 27/2018-CT(R)
    1 October 2021 to 21 September 202512%About 13.8%8/2021-CT(R), after the 45th Council meeting
    From 22 September 20255%About 8.9%9/2025-CT(R), S. No. 437; 15/2025-CT(R) for the service side

    For 1 July 2017 to 31 December 2018, Circular 163/19/2021-GST let suppliers choose the 70:30 method; it did not force it on them. The 2025 cut came from the 56th GST Council meeting on 3 September 2025. For a job that straddles the change, section 14 of the CGST Act fixes the rate from the dates of supply, invoice and payment: where two of those three fall on or after 22 September 2025, the lower rate applies. Ask your installer to show which part of the bill qualifies.

    GST on rooftop solar for homes and PM Surya Ghar

    A household pays GST as part of the vendor's invoice and cannot claim it back. Under PM Surya Ghar: Muft Bijli Yojana, approved by the Union Cabinet on 29 February 2024, central financial assistance is 60% of the benchmark cost up to 2 kW and 40% of the extra cost from 2 to 3 kW, capped at 3 kW. At the 2024 benchmark prices that meant ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more. The assistance is claimed through the national portal and does not change how the vendor computes GST; the invoice still applies the 70:30 split to the full contract price.

    Electricity a household exports to the grid under net metering carries no GST, because electrical energy is exempt. Solar pumps under PM-KUSUM fall in the same 5% entry; the Ministry estimated that a 5 HP pump costing about ₹2.5 lakh became about ₹17,500 cheaper.

    Input tax credit on solar for businesses

    A registered business that uses solar power in its taxable operations can claim the GST on panels, inverters and the installation contract as credit on capital goods, subject to sections 16 and 17 of the CGST Act. A solar plant is plant and machinery, so the block on credit for immovable property in section 17(5)(c) and (d) does not usually apply. In Example 3, the factory recovers the full ₹4,00,500.

    Credit is restricted where the power runs exempt activity. A school, a hospital or a residential society that pays GST on a solar plant cannot claim it, and a business with both taxable and exempt supplies apportions credit under rule 43. Solar module makers buying inputs at 18% and selling at 5% may build up credit, and can seek a refund of accumulated credit on inverted duty structure under section 54(3), subject to the rules.

    Solar invoices, HSN codes and registration

    • Who pays: the supplier charges and deposits the tax under forward charge. There is no reverse charge on solar goods or EPC services bought from a registered vendor.
    • HSN on invoices: businesses with turnover above ₹5 crore show six-digit HSN codes (for example 854143); smaller ones show four digits for business customers.
    • Turnkey invoice layout: show the contract value, the deemed goods value (70%) at 5% and the deemed service value (30%) at 18%, each with CGST and SGST or IGST.
    • Registration: a solar dealer must register above ₹40 lakh turnover of goods (₹20 lakh in some states), and an installer providing services above ₹20 lakh. A seller of goods to buyers in other states must register whatever its turnover. Start with our GST registration page.
    • E-way bill: needed for moving consignments worth more than ₹50,000.

    Make a compliant bill with the GST invoice generator.

    Court rulings on GST for solar power plants

    On 16 November 2026 a bench of Justices Sanjay Kumar and Sanjeev Sachdeva of the Supreme Court decided Sterling and Wilson Pvt. Ltd. v. Union of India (2026 INSC 1222), an appeal from the Bombay High Court. The court held that supplying and installing a solar power generating system was not a works contract, because panels fixed to a foundation can be detached and reused, so the plant is not immovable property. It also held that the 70:30 valuation took effect only from 1 January 2019 and could not be applied to earlier supplies; the circular for 2017 to 2018 gave only an option. The demand of about ₹53 crore, tax and penalty together, was set aside.

    For contracts from 2019 onward, the 70:30 Explanation decides the value whether or not the job is called a works contract.

    GST on solar panels: mistakes on quotes and invoices

    • Charging 12% after 22 September 2025. Old price lists and software masters still carry 12%.
    • Charging 5% on the whole turnkey price. The 30% service share is at 18%.
    • Charging 18% on the whole turnkey price. The 70% goods share is at 5%.
    • Using the 70:30 split for separate bills. It applies only to a single contract for goods and services together.
    • Billing stand-alone batteries or structures at 5%. Sold alone, they are 18%.
    • Using pre-2022 HSN 8541 40 11. Modules are now 8541 43 00 and loose cells 8541 42 00.

    Related rates: an air conditioner for the same home is covered on GST on AC, cement for the plant's foundation on GST on cement, and a rooftop let to a solar developer on GST on rent. Search any other item in the GST rate finder.

    Official sources: PIB: 56th GST Council recommendations · PIB: MNRE on the renewable energy GST cut · CBIC: Central Tax (Rate) notifications · GST Council: UP AAR in M/s Apex Powers · PM India: PM Surya Ghar approval.

    Frequently asked questions

    How much is GST on solar panels after the September 2025 cut?

    GST on solar panels is 5% in 2026, charged as 2.5% CGST and 2.5% SGST within a state or 5% IGST across states. The rate applies to photovoltaic modules, loose solar cells, solar power generators, solar lanterns and solar water heaters. It took effect on 22 September 2025, replacing the 12% rate in force since October 2021.

    Is GST 5% or 18% on solar?

    Both apply, to different parts. Panels and other listed solar goods are at 5%. Installation, design and commissioning services are at 18%. When one contract covers both, 70% of the price is taxed at 5% and 30% at 18%. Batteries, mounting structures and cables sold on their own are also at 18%.

    Does the old 12% GST still apply to solar panels?

    No. The 12% rate applied from 1 October 2021 to 21 September 2025. From 22 September 2025, Notification 9/2025-CT(R) placed renewable energy devices, including panels and cells, in the 5% schedule. A dealer still charging 12% on a new invoice is using an old rate and should issue a corrected invoice or credit note.

    What is the 8.9% GST on solar?

    It is the effective rate on a single contract to supply and install a solar plant. The law deems 70% of the price to be goods at 5% and 30% to be services at 18%. That gives 3.5% plus 5.4%, or 8.9% of the contract value. Before 22 September 2025 the same calculation gave 13.8%.

    What is the HSN code for solar panels?

    Assembled solar modules and panels fall under HSN 8541 43 00, and solar cells not made into modules under 8541 42 00. The old code 8541 40 11 stopped applying when the 2022 version of the HS nomenclature came in. Solar water heaters use 8419 12 00, inverters 8504 40 and batteries 8507.

    What is the GST rate on a solar inverter?

    An inverter supplied inside a turnkey solar contract is part of the 70% goods share at 5%. Sold on its own, an inverter falls under heading 8504 40 at 18%. Some sellers bill solar-only inverters at 5% as solar power based devices, but that view is disputed, so a buyer should confirm the basis on the invoice.

    What is the GST on solar batteries?

    Storage batteries of heading 8507, whether lithium-ion or lead-acid, are taxed at 18%. Lead-acid batteries were at 28% until 21 September 2025. A battery included in a single supply-and-install contract for a solar plant is valued within the 70% goods share at 5%, but a battery added later from a dealer is billed at 18%.

    Can a business claim input tax credit of GST on solar panels?

    A registered business using the solar power for taxable supplies can claim the GST on panels, inverters and the installation contract as input tax credit on capital goods. A household cannot. A school, hospital or housing society making exempt supplies also cannot. Mixed businesses split the credit between taxable and exempt use under rule 43.

    Does the PM Surya Ghar subsidy reduce GST on solar?

    No. GST is worked out on the vendor's full contract price using the 70:30 split. Central assistance under PM Surya Ghar, ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more at 2024 benchmark prices, is claimed separately through the national portal. The lower GST rate and the subsidy together cut the cost.

    Is GST charged on solar power sold to the grid?

    No. Electrical energy is exempt from GST, so a household exporting surplus units under net metering, or a solar park selling power to a distribution company, charges no GST on the electricity. Other charges, such as a developer's rent for a rooftop or an operation and maintenance contract, are separate supplies taxed at their own rates.

    How much does a 3 kW solar system save after the GST cut?

    On a ₹1,80,000 supply-and-install contract, GST falls from ₹24,840 at the old 13.8% to ₹16,020 at 8.9%, a saving of ₹8,820. The Ministry of New and Renewable Energy put the saving on a typical 3 kW rooftop system at ₹9,000 to ₹10,500, depending on the installed price of the system.

    Is the 70:30 rule for solar EPC contracts still valid?

    Yes. The Explanation now sits under S. No. 437 of Notification 9/2025-CT(R), and Notification 15/2025-CT(R) updated the matching service entry. In Sterling and Wilson, decided on 16 November 2026, the Supreme Court held that the split became mandatory only from 1 January 2019; for July 2017 to December 2018 it was merely an option.

    Is GST on solar water heaters also 5%?

    Yes. Solar water heaters and systems of HSN 8419 12 00 moved from 12% to 5% on 22 September 2025, and so did solar cookers. A ₹30,000 solar water heater now carries ₹1,500 of GST instead of ₹3,600. Installation billed separately by a plumber or contractor is a service taxed at 18%.

    Is income from solar power tax free?

    Not as a rule. Savings on your own electricity bill are not income, but money received for selling surplus power can be taxable income for the seller. For businesses, a solar plant qualifies for depreciation under income-tax law. GST is a separate matter: electricity itself is exempt, while the equipment carries 5% or 18%.

    Do solar installers need GST registration?

    Yes, once turnover crosses the limit: ₹20 lakh for a service provider, ₹40 lakh for a supplier of goods only in most states, with lower limits in some smaller states. A dealer selling goods to buyers in other states must register whatever the turnover. Registration lets the installer issue tax invoices that business buyers need to claim credit.

    Sources: GST portal HSN/SAC directory (updated 23 Oct 2026) · CBIC rate notifications: 9/2025-Central Tax (Rate) as amended up to 01/2026-Central Tax (Rate), 30 Apr 2026 (in force from 1 May 2026); services under 11/2017-Central Tax (Rate) as amended. Rates are the total GST (CGST + SGST, or IGST). Content updated .

    Reviewed By

    Abhinay Rai

    Expert for this topic GST classification and rates

    Abhinay Rai

    Advocate

    Abhinay Rai is a Advocate specialising in GST classification and rates. The codes, rates and examples on this page are checked against the GST portal HSN directory and the current CBIC rate notifications, and are updated when a new notification is issued.

    Reviewed byAbhinay Rai
    Content updated
    View LinkedIn Profile